Pictured here is the result after extensive structure and firewall modifications for the PT6 and Wipline Float Fittings. Read on for the more detailed information on the steps we took.
Now that our nose has been removed, we have to add an engine mount and float fittings to support our upcoming modifications.
Here, Madi is presenting our new nose gear box!
Before we can install the mount for our engine, we reinforce the firewall and fuselage:
Once we have fit and riveted our reinforcements, we add Wipline 3450 float fittings:
Looks pretty sharp!
Here, Sheila is working on V Brace reinforcements:
Our results after the sheet metal and engine mount installation show some significant structure change for our Cessna 206.
Comments